Installing pea gravel is one of the easiest landscape projects you can take on. There’s no mixing or cutting, and mistakes are easy to fix. Most of the work is digging and moving stone. This is the full process for a path, patio or bed. Start by measuring and working out your order in the pea gravel calculator.
Tools and materials
| Tools | Materials |
|---|---|
| Flat spade and shovel | Pea gravel |
| Landscape rake (wide, flat) | Crushed stone with fines (for a base) |
| Wheelbarrow | Landscape fabric |
| Tape measure, string, stakes or a hose | Landscape staples |
| Hand tamper or plate compactor (rent it) | Edging and stakes |
| Utility knife, gloves, hose |
Step 1: Measure and order
Measure every part of the area. Split odd shapes into rectangles, circles and triangles. Decide the depth:
| Project | Pea gravel | Base |
|---|---|---|
| Garden bed | About 2 in | None, fabric optional |
| Path | 2 to 3 in | Optional 2 to 3 in crushed stone |
| Patio | 2 to 3 in | 3 to 4 in crushed stone |
| Driveway top | 3 to 4 in | 4 to 6 in crushed stone |
Cubic yards = square feet × depth (in) ÷ 324. Add about 10%. A 10 × 20 ft area at 3 inches needs 1.85 cubic yards, or 2.04 with extra: about 2.85 tons or 110 bags of 0.5 cu ft. Remember the base is a separate order. The calculator also counts edging and fabric.
Bags or bulk? Under about a yard, bags are easy. Over that, bulk delivery is usually cheaper. Have bulk stone dumped on a tarp close to the work area.
Step 2: Mark the area
Use stakes and string for straight lines and a garden hose for curves. Spray-paint the outline. Call 811 before digging deeper than a few inches.
Step 3: Dig out
Remove sod, roots and soil to the total depth of base plus gravel. Keep the bottom flat, with a gentle slope away from buildings (about 1/4 inch per foot). Tamp the soil firm.
Step 4: Install edging
Set your edging so its top will sit about 1/2 inch above the finished gravel. Stake it well. Options and lengths in gravel edging ideas.
Step 5: Lay landscape fabric
Roll it out, overlap seams about 6 inches, run it up the inside of the edging and pin it with staples. Details in landscape fabric under gravel.
Step 6: Add and compact the base (patios, driveways, busy paths)
Spread crushed stone with fines in layers of 2 to 3 inches, wet it lightly and compact each layer with a tamper or plate compactor. Check it’s level or has the slope you want.
Step 7: Spread the pea gravel
Dump wheelbarrow loads in small piles across the area, then spread with the back of a landscape rake to an even depth. Check depth in a few spots with a ruler. Don’t make it deeper than planned on walking surfaces; it will feel loose.
Step 8: Rinse and settle
Hose the gravel down to wash off dust and help it settle. After a week or two of use, rake it level again and top up any low spots with your extra stone.
Optional upgrades
- Stepping stones or pavers set in the gravel for firm footing. See pea gravel walkway.
- A binder to stop scattering. See pea gravel glue.
- A stabilizer grid for driveways and slopes. See pea gravel driveway.
Common mistakes
- No edging. The number one reason gravel areas look messy.
- No fabric or base on soft soil. The stone disappears into the mud.
- Too deep. Over 3 inches on a path or patio feels like sand.
- Wrong slope. Water should run away from the house.
- Ordering too little. Running out halfway means a second delivery fee.
Project guides
- Pea gravel patio
- Pea gravel walkway
- Pea gravel driveway
- Pea gravel fire pit area
- Pea gravel dog run
- Pea gravel for playgrounds
The short version
Measure, order with 10% extra, dig, edge, fabric, base where needed, then 2 to 3 inches of pea gravel, raked and rinsed. Start with your numbers in the pea gravel calculator.